Build Your Deck Faster: How Helical Piers Slash Project Timelines

Posted in: piers

James Moylan

Wednesday, June 25, 2025

Design Builders Pier Tech 7

Time is money—especially when it comes to outdoor construction. Whether you're a contractor managing multiple builds or a homeowner eager to enjoy your new space, delays are frustrating and expensive. One of the smartest ways to gain back time in a decking project? Helical piers.Free e book choosing a dependable contractor

At Design Builders, we've made helical pier foundations a core part of our process for elevated decks and porches, and the time savings are hard to ignore. Here’s how this modern foundation method helps you build faster, cleaner, and smarter.


🛠️ What Are Helical Piers?

Helical piers are large steel screws that are mechanically driven into the ground to serve as deep foundational anchors. Unlike concrete footers that require digging, forming, pouring, and curing, helical piers go in fast—and are ready to build on immediately.


⏱️ 30 Minutes Per Pier, Not 3 Days Per Footer

Traditional footers require excavation, inspection, concrete delivery, and several days to cure before framing can begin. In contrast, helical piers can be installed in as little as 30 minutes per pier—no waiting, no weather delays, no concrete trucks.

Once the pier is in the ground and torque-verified, your team can start building that same day. That’s a huge win for contractors trying to stay on schedule—or get ahead of it.

pier 20


📦 Less Mess, Fewer Delays

Helical piers eliminate the most disruptive part of a foundation job:

  • No trenching

  • No spoil removal

  • No concrete spills

  • No rescheduling due to rain or soft ground

That means less cleanup, less equipment, and less risk of pushing your timeline out a week or more due to conditions beyond your control.


🔩 One-Bolt Connections Speed Up Framing

Some helical pier systems—like those used by our team at Design Builders—are engineered with simplified connection points that use just one structural bolt per bracket. That may not sound like much, but across a project with 10–20 piers, it can save hours of labor and reduce potential alignment issues.

With fewer components to align and fasten, your crew gets to framing faster and with more precision.


💸 Faster Builds = Lower Labor Costs

Every day you save on a build is a day of labor, management, and site rental saved. For builders, this adds up to tighter scheduling and higher profitability. For homeowners, it means shorter disruptions and faster enjoyment of their new deck.

helical pier photo 4


🧠 Bottom Line: Smart Foundations Set the Pace

Helical piers are about more than strength—they’re about efficiency. They allow your project to start sooner, progress faster, and finish cleaner. If you're in a high-demand season or working under tight timelines, they could be your best friend.

At Design Builders, we've seen the difference firsthand. Our crews install piers in the morning and are framing decks by lunch. That’s the kind of efficiency that turns great projects into great experiences.  Design Builders also offer helical pier classes.  Want to learn more ? Call 301-875-2781 or email tim@designbuildersmd.com and learn more about our helical pier process.